鐵之狂傲

 取回密碼
 註冊
搜尋

版主

S.I.A.M 管理者

Rank: 3Rank: 3Rank: 3

切換到指定樓層
1#
V-22 Osprey
The V-22 Osprey is a tiltrotor vertical/short takeoff and landing (VSTOL), multi-mission air-craft developed to fill multi-Service combat operational requirements. The MV-22 will replace the current Marine Corps assault helicopters in the medium lift category (CH-46E and CH-53D), contributing to the dominant maneuver of the Marine landing force, as well as supporting focused logistics in the days following commencement of an amphibious operation. The Air Force variant, the CV-22, will replace the MH-53J and MH-60G and augment the MC-130 fleet in the USSOCOM Special Operations mission. The Air Force requires the CV-22 to provide a long-range VTOL insertion and extraction capability. The tiltrotor design combines the vertical flight capabilities of a helicopter with the speed and range of a turboprop airplane and permits aerial refueling and world-wide self deployment.



Two 6150 shaft horsepower turboshaft engines each drive a 38 ft diameter, 3-bladed proprotor. The proprotors are connected to each other by interconnect shafting which maintains proprotor synchronization and provides single engine power to both proprotors in the event of an engine failure. The engines and flight controls are controlled by a triply redundant digital fly-by-wire system.

The airframe is constructed primarily of graphite-reinforced epoxy composite material. The composite structure will provide improved strength to weight ratio, corrosion resistance, and damage tolerance compared to typical metal construction. Battle damage tolerance is built into the aircraft by means of composite construction and redundant and separated flight control, electrical, and hydraulic systems. An integrated electronic warfare defensive suite including a radar warning receiver, a missile warning set, and a countermeasures dispensing system, will be installed.
 
轉播0 分享0 收藏0

回覆 使用道具 檢舉

版主

S.I.A.M 管理者

Rank: 3Rank: 3Rank: 3

BACKGROUND INFORMATION

The V-22 is being developed to meet the provisions of the April 1995 Joint Multi-Mission Vertical Lift Aircraft (JMVX) Operational Requirements Document (ORD) for an advanced vertical lift aircraft. The JMVX ORD calls for an aircraft that would provide the Marine Corps and Air Force the ability to conduct assault support and long-range, high-speed missions requiring vertical takeoff and landing capabilities.

Since entry into FSD in 1986, the V-22 T&E program has concentrated principally on engineering and integration testing by the contractors. Three periods of formal development test by Naval Air Warfare Center-Aircraft Division (NAWCAD) Patuxent River, plus OTA participation in integrated test team (ITT) activities at Patuxent River, have provided some insight into the success of the development effort. After transition to EMD in 1992, an integrated contractor/government test team conducted all tests until OT-IIA in 1994. Since then, two additional periods of OT&E have been conducted.

The first operational test period (OT-IIA) was performed by COMOPTEVFOR, with assistance from AFOTEC, from May 16 to July 8, 1994, and accomplished 15 hours of actual flight test operations, within an extremely restricted flight envelope. The Navy, with Air Force support, published a joint evaluation report addressing most mission areas the V-22 is to perform.

OT-IIB was conducted from September 9, to October 18, 1995, and comprised 10 flight hours in 18 OT&E flights, plus ground evaluations. A joint Air Force/Navy OT-IIB report was published. Partly in response to DOT&E concern expressed over the severity of V-22 downwash in a hover observed during OT-IIA, the Navy conducted a limited downwash assessment concurrently with OT-IIB, from July to October 1995.
 

回覆 使用道具 檢舉

版主

S.I.A.M 管理者

Rank: 3Rank: 3Rank: 3




TEST & EVALUATION ACTIVITY

In accordance with the approved TEMP, OT-IIC was conducted in six phases at NAS Patuxent River and Bell-Boeing facilities in Pennsylvania and Texas, from October 1996, through May 1997.

Significant flight limitations were placed on the FSD V-22 in OT&E to date, including:

not cleared to hover over unprepared landing zones until OT-IIC
no operational internal or external loads or passengers
moderate gross weights only
not cleared to hover over water.
In addition, FSD aircraft equipment was not representative of any mission configuration. Together, these aircraft clearance and configuration limits produced an extremely artificial test environment for OT-IIC.

The OT-IIB report expressed serious concerns regarding the potential downwash effects, and recommended further investigation. While a limited assessment of downwash and workaround procedures was included in OT-IIC, complete resolution of the downwash issue will not be possible until the completion of OPEVAL, just prior to milestone III in 1999.

The Navy is conducting an aggressive LFT&E program on representative V-22 components and assemblies, in compliance with a DOT&E-approved alternative LFT&E plan. The V-22 program was granted a waiver from full-up, system-level LFT&E in April, 1997. The vulnerability testing that the program is performing is appropriate and will result in the improvement of aircraft survivability.

The V-22 program TEMP was last approved by DOT&E on September 28, 1995, and will be updated prior to each OT&E period scheduled.
 

回覆 使用道具 檢舉

版主

S.I.A.M 管理者

Rank: 3Rank: 3Rank: 3

TEST & EVALUATION ASSESSMENT

With DOT&E encouragement, the Navy greatly expanded the scope of OT-IIC to get better insight into the effectiveness and suitability of the EMD design. The results, while not yet conclusive regarding the potential operational effectiveness and suitability of operational aircraft, were encouraging. The six phases of the OT-IIC Assessment included: (1) shipboard assessment, (2) maintenance demonstrations, (3) tactical aircraft employment via FSD aircraft and manned flight simulator, (4) operational training plans, (5) program documentation review, and (6) software analysis.

In assessing the operational effectiveness and suitability COIs, COMOPTEVFOR and AFOTEC found that in most cases, only moderate risk exists that the COIs will not be satisfactorily resolved when development is complete. Enhancing features observed during OT-IIC included aircraft payload, range and speed characteristics better than the stated operational requirements. In addition, reliability, availability and maintainability of the EMD aircraft appeared to be significantly improved over those of the FSD aircraft.

Several areas of concern first discovered in OT-IIA or OT-IIB remain unresolved because of limitations to the EMD flight test operations. These concerns include severe proprotor downwash effects during personnel insertion and extraction via hoist or rope. In addition, concerns exist in the areas of communications, navigation , and crew field of view. New concerns arising from OT-IIC regarding the EMD schedule are being addressed by the program manager. Also, the reliability and maintainability of a few subsystems will require management attention. Despite these concerns, the V-22 design remains potentially operationally effective and suitable.


The aircraft's prime contractors include Boeing Company's helicopter division in Ridley Park, PA, and Bell Helicopter Textron of Fort Worth TX.

In 1986 the cost of a single V-22 was estimated at $24 million, with 923 aircraft to be built. In 1989 the Bush administration cancelled the project, at which time the unit cost was estimated at $35 million, with 602 aircraft. The V-22 question caused friction between Secretary of Defense Richard B. Cheney and Congress throughout his tenure. DoD spent some of the money Congress appropriated to develop the aircraft, but congressional sources accused Cheney, who continued to oppose the Osprey, of violating the law by not moving ahead as Congress had directed. Cheney argued that building and testing the prototype Osprey would cost more than the amount appropriated. In the spring of 1992 several congressional supporters of the V-22 threatened to take Cheney to court over the issue. A little later, in the face of suggestions from congressional Republicans that Cheney's opposition to the Osprey was hurting President Bush's reelection campaign, especially in Texas and Pennsylvania where the aircraft would be built, Cheney relented and suggested spending $1.5 billion in fiscal years 1992 and 1993 to develop it. He made clear that he personally still opposed the Osprey and favored a less costly alternative.
The program was revived by the incoming Clinton administration, and current plans call for building 458 Ospreys for $37.3 billion, or more than $80 million apiece, with the Marines receiving 360 Ospreys, the Navy 48 and the Air Force 50. The first prototype flew in 1989. As of early 2000 three test aircraft had crashed: no one was killed in the 1991 crash, an accident in 1992 killed seven men, and the third in April 2000 killed 19 Marines.
 

回覆 使用道具 檢舉

版主

S.I.A.M 管理者

Rank: 3Rank: 3Rank: 3

Specifications
Primary functionAmphibious assault transport of troops, equipment and supplies from assault ships and land bases
Prime Contractor(s)
Boeing Defense and Space Group, Philadelphia, PA
Bell Helicopter Textron, Ft Worth, TX
Allison Engine Company, Indianapolis, IN
DescriptionThe V-22 Osprey is a multi-engine, dual-piloted, self-deployable, medium lift, vertical takeoff and landing (VTOL) tiltrotor aircraft designed for combat, combat support, combat service support, and Special Operations missions worldwide. It will replace the Corps' aged fleet of CH-46E and CH-53D medium lift helicopters
VariantsCV-22 will be utilized by the Air Force for their Special Operations missions maintaining maximum commonality with the MV-22. Aircraft avionics peculiar to the Air Force unique mission requirements constitute aircraft differences. HV-22 will be used Navy the for Combat Search and Rescue and fleet logistics support.
Length57' 4" - Spread
63' 0" - Folded
Width84' 7" - Spread
18' 5" - Folded
Height22' 1" - Spread
18' 1" - Folded
Takeoff Weights47,500 lb Vertical Takeoff/Landing (VTOL)
55,000 lb Short Takeoff/Landing (STOL)
60,500 lb Self Deploy STO
Range200nm Pre-Assault Raid with 18 troops
200nm Land Assault with 24 troops
50 nm (x2) Amphibious Assault
500 nm Long Range SOF Missions (USAF/CV-22)
2100 nm Self Deploy (with one refueling)
50 nm External Lift Operations with 10,000 lb load
Cruise Airspeed240 kts (MV-22)
230 kts (CV-22)
MilestonesFirst Flight - March 19, 1989
First Sea Trials - USS Wasp (LHD-1), December, 1990, Aircraft # 3 & 4
First EMD Flight - February 5, 1997
2nd Sea Trials - USS Saipan (LHA-2), January, 1999, Aircraft #10
First LRIP Delivery - May 25, 1999
OPEVAL - Scheduled October, 1999 to May, 2000
Full Rate Production - First Quarter, 2001
IOC - USMC - 2001; US SOCOM - 2004
 

回覆 使用道具 檢舉

版主

S.I.A.M 管理者

Rank: 3Rank: 3Rank: 3

Unit Cost $40.1M (Total Program Recurring Flyaway, Constant Year, FY94$)
Number Procured 12 MV-22(authorized through FY98)
Planned Inventory348 MV-22 (USMC)
50 CV-22 (USAF)
48 HV-22 (USN)
Deployed toMV-22s will be deployed to all Marine Corps medium lift active duty and reserve tactical squadrons, the medium lift training squadron (FRS), and the executive support squadron (HMX)
 

回覆 使用道具 檢舉

版主

S.I.A.M 管理者

Rank: 3Rank: 3Rank: 3

 

回覆 使用道具 檢舉

版主

S.I.A.M 管理者

Rank: 3Rank: 3Rank: 3

























(文章來自:美國貝爾直升機)
 

回覆 使用道具 檢舉

版主

S.I.A.M 管理者

Rank: 3Rank: 3Rank: 3

Q:

美國的V-22到底算飛機還是算直升機?


A:

雖說是貝爾直升機公司製的第一架直昇機,但基本上美國將它編在”多軍種先進垂直起落飛機”’上

也就是新機種"未來旋翼機"中,算是飛機的一種。
 

回覆 使用道具 檢舉

版主

S.I.A.M 管理者

Rank: 3Rank: 3Rank: 3

V-22「鶚」式飛機

貝爾公司根據XV-15的發展經驗與基礎,1981年向美國國防部提出三軍聯合先進垂直升力飛機(Joint Services Advanced Vertical Lift Aircraft,JVX)計畫,這是種多重用途飛機,能與美軍當時的運輸用直升機搭配,或直接取代直升機的角色,優異的性能符合美國三軍的需要。美國國防部接受了JVX計畫提案,之後貝爾公司發展出V-22鶚鳥(Osprey)式系列飛機。

一)任務簡介:作為一種多用途飛機,V-22鶚鳥式的主要任務是作為美軍陸戰隊的兩棲突擊運輸機。由於陸戰隊的CH-46「海武士」和CH-53「超級種馬」兩款運輸直升機都已過於老舊,許多甚至是超過40年役齡且經過多次延壽的骨董飛機,因此鶚鳥式對美軍陸戰隊來說是一大福音,可有效解決現役運輸直升機飛安與妥善率不佳的問題。


(二)效益卓越:鶚鳥式在美軍陸戰隊的型號是MV-22。與現有的CH-46海武士直升機相比,它的戰鬥巡航速度和作戰半徑分別增加1倍和5倍,而且運轉的噪音減低4倍。假設美軍陸戰隊計畫對150浬外的登陸點進行兵力投射,使用現役的CH-46或CH-53需10小時以上,使用MV-22則僅需2小時,因此其任務效益相當明顯。
 

回覆 使用道具 檢舉

你需要登入後才可以回覆 登入 | 註冊

存檔|手機版|聯絡我們|新聞提供|鐵之狂傲

GMT+8, 24-6-5 17:59 , Processed in 0.022653 second(s), 15 queries , Gzip On.

回頂部